1990 AJHSME Problems/Problem 17
Problem
A straight concrete sidewalk is to be feet wide,
feet long, and
inches thick. How many cubic yards of concrete must a contractor order for the sidewalk if concrete must be ordered in a whole number of cubic yards?
Solution
This is a yard by
yard by
yard sidewalk, so its volume in yards is
Since concrete must be ordered in a whole number of cubic yards, we need
.
See Also
1990 AJHSME (Problems • Answer Key • Resources) | ||
Preceded by Problem 16 |
Followed by Problem 18 | |
1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 • 19 • 20 • 21 • 22 • 23 • 24 • 25 | ||
All AJHSME/AMC 8 Problems and Solutions |